Our latest platform release is 2026.4.1 (for the Web Application), 2026.4.2 (for Mobile Application).
App / Improved / Visibility fix for allocation screen
Web / New / Shift Record Locking / read only Shift Record and mechanism for locking
App / New / Shift Record Locking / read only support on App and related updates
Web / New / Shift Record Approval / Approval mechanism added and paired with locking
Web / New / Webhooks and public API / outbound webhook system
Web / Improved / MCP / Added fatigue to the MCP tool
Web / New / QS Agent / Quality scoring system and review drawer
Web / Improved / Dashboards / Consistency of column names and text on datagrids
Web / Improved / Dashboards / Approvals Tab is now only accessible by Commercial Admins
Web / Improved / Dashboards / Approval Tab now includes record links to PDF report or actual Shift Record
Web / Improved / Password reset screen has been updated to Gather 2.0
Web / Improved / Shift Record merge process improved to prevent rounding on date times
Web / Improved / Migration to amend rounding discrepancy in reports for Resource times
Web / Improved / Combined Shift Report improvements
App / Fixed / Image uploading failing on some devices
Web / Improved / Fatigue Email now supports new fatigue insights URL
APP / Fixed / Internal guardrails for async storage
Web / Improved / Dashboard now supports more access types
Web / Improved / Workspace Dashboard Project scoping improved
Web / Improved / Updated time picker to allow direct input and detached time from date where appropriate
Web / Fixed / Dashboard Combined Shift Report Export
API / Improved MCP compatibility with multiple services.
Improved / Workspace dashboard improvements
Hotfixes for cache, sync and records post 2026.2.2 release
Web / New / Workspace Dashboards now available with Resource, Performance, HSQE, and Access tabs, including filtering by Access Type, Project Configuration, and Projects.
Web / New / Workspace Dashboards support merged Project Configuration reporting across multiple Projects.
Web / New / Main Dashboard now supports built-in dashboards, Fatigue dashboards, and custom Power BI integration.
Web / New / PDF Reports now support additional images in the appendix.
Web / Improved / Performance tab now automatically determines the correct view based on Project Configuration, removing the need for manual rail/non-rail selection.
Web / Improved / Dashboard loading progress bar is now more responsive.
Web / Improved / Legacy platform URLs now redirect to their correct location on the new platform.
Web / Fixed / Workspace Dashboard permissions now correctly allow Office Users and above to see all Projects they are assigned to.
Web / Fixed / Workspace Dashboard filters now apply consistently across Assignee, Project, and Configuration selections.
Web / Fixed / Workspace Dashboards no longer repeatedly request data when switching between browser tabs.
Web / Fixed / Shift Planner no longer produces false validation errors when editing a datasource in Plan Summary.
Web / Fixed / Shift Planner no longer crashes when Project Configurations are changed involving Subcontractors.
Web / Fixed / Approval process now handles Shift Records without approval fields gracefully.
Web / Fixed / PDF Reports no longer fail when field data is missing from a Shift Record.
Both / Fixed / Required validation now correctly enforced on image fields.
App / Improved / Updated internal support and analytics packages.
API / New / MCP Server integration.
API / Improved / Speed improvements throughout, to further support MCP and workspace dashboards.
Web / Fixed / Tags / Clicking on a Tag in datagrids now opens the Tag Modal for users with the correct permissions.
Web / Fixed / Project Fields / Copy to clipboard functionality now works on Activity Information tables
Web / Fixed / iPad Portrait mode no longer cuts off Shift Record pagination.
Web / Fixed / Shift Planner now no longer allows invalid values to be planned in when pasted from the clipboard.
App / Fixed / Creating a Shift Record and not making changes to it while offline in the app now correctly marks it as “Not Uploaded” rather than “Up to date”
Both / Improved / Empty states for options no longer display “N/A”, and are more descriptive of what action to take where appropriate.
Web / Improved / Shift Planner empty states of dropdown options.
Web / Improved / Shift Planner now better handles long values in select options by including tooltips
Web / Changed / Job Title icon on User profiles
App / New / Support Android 16 new device permissions (camera, location etc)
Web / New / Bulk actions framework on Shift Record view + ability to delete multiple Shift Records
Web / New / Configurable Combined Shift Report PDF is now available in Project dashboards
App / New / Introduced a new app state to simplify sync. “Not Uploaded” now shows clearly when a Shift Record is not yet synced with the API
App / Improved / Adjusted Card UI on Record/Projects so that more information can be seen on screen
App / New / Added Pull to refresh on Project and Record List screens
App / Improved / Added Record Summary screen status to clearly display when a Shift Record is Submitted but not yet uploaded + upload progress bar.
Both / Improved / Replaced the “None” selection option with a clear icon in worklog event custom comment fields where selection boxes are enabled.
API / New / Shift Record Public API and API docs
Web / Improved / Tidied up Possession Access section on PDF reports for certain configurations that need only part of the section
Web / New / Work reference approval dashboards
APP / 16Kb Page size support for Android
APP / Internal Package Updates (pdf viewer, gleap, logrocket)
Web / Improved / Selecting many Filters in Filterbars now limits to displaying five chips per category, reducing space used on screen.
Web / Improved / Re-introduced Shifts receiving remote changes from API when in editmode but not edited locally.
App / New / Introduced Shifts receiveing remote changes from API when in editmode but not edited locally.
Web / Fixed / Unassign From Project X button now correctly allows users to be unassigned
Web / Fixed / Fatigue Tracking no longer displays on People screen when Fatigue tracking is disabled for a Workspace
App / Fixed / Fixed RACE condition causing locally saved records to become untracked/unsyncable when iOS/Android triggered application cleanup while app is in standby.
Web / New / Shift Planner / Users can now duplicate planned shifts to selected dates and choose what to duplicate.
App&Web / New / Worklog Events (Comments) now support up to five custom fields to be inserted alongside a comment.
App / Fixed / Allocation Page no longer crashes in specific circumstances with iOS and People Profiles.
Web / Improved / Visiting a link in the web/email under the wrong workspace now gives the user the option to switch to the correct one if they have access to it.
Web&App / Improved / No Variance now correctly enforces which values are available depending on Access timings.
Web / New / New Dashboard Tab and Client Rep filter now available for some configurations.
Web / New / Dashboards / Support for Additional customer configs within Project Dashboards
Web / Fixed / Dashboards / Dashboards no longer crash when selecting certain small date ranges
Web / Fixed / Filters no longer persist between Workspaces causing zero results to be found in datatables
Web / Fixed / Report download menu items now close when clicked preventing multiple accidental downloads of the same reports
Web / Improved / All dashboard filters apart from Date ranges now filter data locally instead of requesting from the API.
Web / Improved / Hidden fields in worklog no longer show in dashboard data-tables.
Web / Fixed / DateTimes now correctly show 24-hour clock
Web / Fixed / Signed Documents are now downloadable from the API
Web / Improved / Dashboards now use Shift Productivity Score rather than Efficiency Score for Scatter Charts
Web / Improved / Dashboards / Firmed up what columns show in Worklog table when Project configurations change over time.
Web / Improved / Dashboards / Shift Records without worklog entries are no longer included in data-tables
Web / Fixed / Dashboards / It is no longer possible to filter by the invalid filters in the checkbox filters
Web / Fixed / Dashboards / HSQE tooltip sticky now appears in the correct location
Web / Fixed / Switch Project Dropdown now correctly triggers data-table filterbars to reset/update
Web / Improved / Dashboards / Added support to export the datagrid on the access analysis chart
Web / Improved / Adjusted UI bunching up of tags when Shift Records have many on multiple lines.
Web / Fixed / Dashboard charts no longer crash sometimes when navigating and mousing over them quickly or repeatedly.
Web / Improved / Required Lists in Shift Records now have a Required Asterix *
Web / Improved / Dashboards / Assignee filter now matches assignee filter in Shift Records list.
Web / Improved / Dashboards / Worklog Tables now feature every column in a Project configurations worklog section.
Web / Improved / Project Settings now default to inheriting Workspace options on all new Projects. Settings remain the same for existing.
Web / Improved / Error Messages for too larger dates in reports are now clearer.
Web / Improved / Shift Record Page stepper no longer paginates, so all page links are visible
Web / Fixed / Available Attribute options now correctly update when editing Workspace attributes whilst also editing People.
Web / Improved / Tag, Workspace selection and other simple modals are no longer full screen on mobile devices.
Web / Improved / Filter bar sorting and filtering now persists throughout a user session (until a page refresh)
Web / New / Additional Access Types such as highways are now included in Access score calculations
Web / Improved / Date filter bar now correctly handles dates within Project dates and informs you of the available dates to select
Web / Improved / Datasource Settings automatically sort from A-Z and persist between saves
Web / Improved / Shift Planner drawer no longer closes when clicking elsewhere on the screen so users don’t accidentally discard unsaved changes.
Web / Improved / Row hover effect is more prominent
Web / Improved / Dashboards now support custom labels from different Project Configurations
Web / Fixed / Removed references to raildiary.com in password resets
Web / Fixed / Dashboards / Popovers no longer overhang other visuals when selected
Web / Fixed / Removed Welcome email reference to the academy site
Web / Fixed / Loading state no longer shows “no data” initially
Web / Fixed / Changing a Shift Record now correctly reflects in the Shift Record List page
Web / Fixed / PDF Shift Reports now correctly show images for users force upgraded to the new platform.
Web / Fixed / Allocation save and Close button now allows for hours to be saved when overallocation is enabled.
API / Fixed / PDF reports now return appropriate error messages when date ranges selected are outside of the Project
Web / Fixed / Tag titles now contain tooltips
Web / Fixed / Long Comments now elipsis as stay on one line in table headers
Web / Fixed / Combined Shift Report now functional
Web / Improved / Default Sort order is now applied to all tables in dashboards
Web / Improved / All custom reports now contain a description
Web / Improved / Subcontractor Labour is now “Subcontractor” in Shift Planner
Web / Fixed / Tag filters are now showing correctly in Project Summary Reports
Web / Fixed / Adding a new Profile to People and clicking back no longer crashes the application
Web / Fixed / Customer Logos now display correctly in PDF Reports
Web / Improved / Project and Workspace settings now use virtualised tables to improve performance for thousands of lines. UX now sets height to screen height to reduce page scroll
Web / Dashboards / Many UX/UI Fixes to enable us to start rolling out to customers.
Release Notes below this box refer to Legacy platform updates. Above this box references legacy web updates as “Legacy Web”.
New / We have started platform v2 rollout
Fixed / Allocation / Profile Names now show correctly in allocation page
Fixed / People Management / It is now possible to add users who were previously deleted.
We have temporarily disabled links to the Gather Academy while we update the course materials
Platform V2 API
Improved / Shift Records / Sorting by Week includes year
Improved / Shift Report PDF / Removed Repeated reference to “Line Block” in the line block section.
Improved / API / Internal report configurations now use unified naming convention.
Improved / API / URL Routing for v1/v2 platforms
Fixed / WEB / Page accordion state now resets when changing page.
Improved / API / Merging of Lists (People, Equipment, Materials, Comments, Worklogs) when collaborating with others.
Improved / Shift Planner / Review feature now includes People outside of the acting user’s Project access allowing them to review fatigue across entire workspace rather than rely on daily Email notification.
Improved / Cached Reports / Fatigue reports now include People outside of the acting user’s Project access, allowing them to review fatigue across the entire workspace rather than rely on daily Email notification.
Improved / Compliance Detail Report / Now includes “Shift Submitted Time” and “Last updated” date for improved visibility on Shift Record updates.
Fixed / API / Fixed Email Notification queue
Fixed / App / Fixed local storage sanity checks now correctly waits for all stores to be hydrated before checking to untrack records.
Fixed / App / Internal UUID creation is now more resilient to correcting UUIDs when dependant libraries produce errors
Improved / App / Improvements to logging on Android 15
Improved / App / Complete rewrite of sync queue, state, and error tracking for records, files, and images.
Improved / App / Sync will now pause while modal boxes are open in the UI.
Improved / App / Expo upgraded from 50 to 53, new architecture and react 19.
Improved / App / File handling improvements to add support for external app filesystems, such as dropbox, google drive, and teams.
New / App / Signatures now feature a delete icon allowing un-synced signatures to be removed.
Improved / Reports / Report PDFs now support custom text placeholders in tables.
Fixed / API / Minor sync issues when native application Shift Record Template is out of sync with the API
Fixed / API / Sharing via the Mobile app now working as intended
Fixed / Web / Shift Planner no longer sometimes duplicates planned shifts when planning many on some devices.
Improved / Allocation Detail Report reports more accurate resource duration to combined hours
New / Support for Subcontractor Labour Resources
Improved / Allocation pages separate resources by type
Improved / Equipment hours allocation now takes quantities into account
Improved / Fatigue reviews in Shift Planner now display “Over 24 hours” when no prior data or there are large durations between shifts.
Fixed / Network Rail week reporting as 53 when should be 2025 week 1
Fixed / Shift Record List now correctly sorts statuses when selecting sort by status
Fixed / Shift timings under certain circumstances skip ahead due to daylight savings time.
Added / Ability to sign in to Gather app and web using Microsoft Login
Added / Worklog Events Report
Improved / Support for older Safari browsers
Improved / Under the hood authentication handling on app and web.
Improved / Messaging on Report download statuses
Fixed / Android not collecting Latitude and Longitude under certain conditions
Added / Multiple Image upload support for Shift Comments, Delivery Notes, Health and Safety Issues, Environmental Issues, Per-work Notes, and other comment sections.
Fixed / Image Locations not reporting on some Android devices.
Fixed / Site document signatures now display correctly in web view
Fixed / Images no longer sometimes reappear/disappear in between syncing under certain conditions
Improved / Allocation / Adjusted column widths.
Fixed / Shift Duration / 24 hour validation now correctly applies
Fixed / Weekly Summary Emails / Missing Total People hours
Updated / Shift Report PDF / 'Equipment Qty' to 'Equipment Quantity'
New / Shift Record / Auto propagation of Shift Date Time change to all other related times and dates.
Improved / Shift Record / Confirmation Modal popup when Shift Date/Time changes.
Fixed / Shift Record / Cancelling delete of an item within a list no longer prevents subsequent taps on that list items three-dot menu (App only)
Fixed / People can now be copied within the Time Card configuration
Fixed / Shift Record / Users are no longer able to tap elsewhere on the screen to break the confirmation modal when creating a Shift Record (Android App Only)
Fixed / Sync / Sync process halting indefinitely under certain conditions.
Improved / Shift Record / Worklog Events now autosave when adding images on a new event. (App Only)
Improved / Network connectivity detection (App Only)
Improved / Sync auto-retry and backoff strategy rather than failure when connectivity is limited (App Only)
Improved / Responsiveness of application under certain conditions. (App Only)
Improved / Automatic abort and information on slow connection when Site Documents are being downloaded. (App Only)
Fixed / Sync process no longer interferes with some user interactions. (App Only)
Improved / Background sync includes timeout and backoff to minimise chance of being blocked by OS. (App Only)
Improved / Creating a new Shift Record when internet is spotty now auto falls back to creating offline. (App Only)
Fixed / Worklog Event Comments no longer duplicate briefly during sync. (App Only)
Fixed / Prevented new worklog events from sometimes disappearing under certain conditions. (App Only)
Fixed / Auth / Users upgrading from older versions of the app no longer get caught with sync auth bug under certain conditions. (App Only)
Improved / UI performance of Project record list view. (App Only)
Fixed / Adding a new worklog then removing the image without any text no longer allows blank comments to be saved. (App Only)
Improved / Auth / Session refresh now queues all data requests. (App Only)
Note: Native version 2024.12.1 requires a forced app upgrade
Improved / Pagination and Filtering on People Profiles
Improved / Added Support for Fatigue Tracking in Timecard configurations
Fixed / Shift Planner / Error preventing planning on configurations with Resource Times removed.2024.10.4 - Released on 20.11.2024 (Web App)
Improved / Delivery Notes added to Shift Report PDF and appendix
Fixed / Worklog author no longer overwritten on sync when editing record as Project Admin
Note: Native version 2024.10.4 requires a forced app upgrade
Fixed / Worklog Events no longer disappear when adding them before a new Worklog is allowed to sync
Fixed / Last modified date now shows correctly for Shift Records that are created offline
Fixed / Items added to Worklog Events from the gallery now no longer sometimes fail to be added on the first attempt.
Fixed / Shift Records created offline now no longer display “Unassigned” in the Shift Record List before they have been synced.
Fixed / Worklog / List column headers no longer display ‘-' when the row value is recorded as '0’
Fixed / Hours Allocation / List column headers no longer display ‘-' when the row value is recorded as '0’
Fixed / People / Datasources “Clear all options” now persists when saved
Improved / Various Text/terminology improvements
New / Shift Record / Added the ability to display “Attributes” of People in Shift Records - option available via support ticket.
Improved / Shift Record / Enhanced Access Information
Improved / Shift Record & Report / Resource Management Terminology updates
Improved / Fatigue Dashboard / Revised dashboards inline with terminology updates
New / Shift Records / Worklog Variance Category
Improved / Power BI integration security updates
New / People Detail Report to replace Labour Detail
Improved / Native app sync errors now move to top of list
Improved / Further updates to improve sync
Improved / Improved OS permissions requested to bare minimum (Google Play policy update)
+10 qol fixes
Fixed / Certain Native app users no longer stuck with sync pending.
Improved / Shift Report PDF / Unsigned/Unused Site documents no longer appear on Shift Reports.
Improved / Shift Report PDF / Allocation section now shows columns according to the Project specification rather than a static set of columns.
Improved / Siteview / Performance has been significantly improved
New / Siteview / Added date filters
Improved / Fatigue Exceedance Email timing.
Improved / Replatformed Native app navigation
Improved / Reactivity between status on various native app screens
New / Added Gleap Support Integration
Improved / UI of main status bar
New / Project Page / Added “Created By” column in Shift Record List
Fixed / Minor issues with iOS devices inconsistently returning cryptographic identifiers.
Improved / Allocation Summary Report Performance
New / Time Card Configuration
Improved / People Profiles list improvements
Improved / Shift Planner / Significant performance improvements of Fatigue Review.
Improved / Project List Request Performance
Fixed / Shift Planner / No longer crashes when adding Labour and switching Suppliers under certain configurations
Fixed / Shift Planner / Fatigue Modal appears correctly for all reviews
Fixed / Project Settings / Empty rows no longer block saving
Improved / Shift Report PDFs now toggle between People and Labour automatically
Improved / People / Status Filter now set to show active profiles by default
Improved / Shift Planner / Travel Times now set to on by default when People Profiles is enabled
Improved / People / Labour Roles renamed to Roles
Improved / Fatigue / Reports now autoswitch between live and migration mode
Improved / Allocation report stability for varied configurations
Fixed / Users now able to plan Labour into Shift Planner when there is only one Project and that Project is marked as a Training/Example Project
New / Added People Profiles Migration Mode for customers previewing workspace migration
Fixed / Download All Fields no longer disabled.
Fixed / Authentication Token auto-refresh errors on Native
Fixed / Shift Planner / Possession Access no longer crashes for some customers.
Improved / Shift Planner columns now have a default width
Fixed / Profile “Save Changes” confirmation now appears when changes are made and users go back
Fixed / Shift Planner / Some users no longer receive access denied error when reviewing Labour
Fixed / Project Settings / Works activities no longer filtered out on new Projects for certain configurations
New / People Profiles
Improved / Fatigue Tracking integrated into People Profiles
Improved / Small tweaks to the UI
Improved / Sitedocuments consider People Profiles
Improved / Stability of Project and Workspace settings
Fixed / Shift Planner / Project Configuration now only appears when Project configurations are updated.
No public notes
Improved / Multiple Event Feeds are now supported in Shift Records
Fixed / Native app no longer requires users to re-login every 24 hours.
Improved / Calculated fields in Shift Records no longer trigger Record saves when no change is made.
Improved / Tidied up Allocation section on PDF Report, no longer includes line items with zero hours.
New / Worklog Events are now editable by Project Administrators
Improved / Under the hood improvements how API requests are made
New / Web and Native app Shift Record submit buttons now on Shift Overview screen
Improved / Messaging when a Shift Record has been submitted
New / Custom support for blocking access to making Shift Record changes when Shift Records have a specific status.
Fixed / Invalid none productive hours no longer throw a sync error.
Other / Email updates now default to app.gatherinsights.com
Fixed / Combined Shift Reports now support filtering by Tags
Improved / Allocation None Productive Time now factors in resource timings where available.
Improved / Error Messages when CSV Reports are selected with date ranges outside available Project dates
Improved / Adding new Shift comments no longer produce sync errors under certain conditions
Improved / “Network Rail Week” calculation improvement
Fixed / Mobile / Expired user sessions no longer cause permanent splash screens on some devices
Improved / Mobile / Remote record check failure no longer causes a popup alert over the Sign-in Screen
Other security updates
Improved / Saved web filter UX
New / Support for ignoring specific actual fields when determining a Shift REcord is “Awaiting Actuals” or “Draft”
Improved / Major overhaul of native app architecture
Fixed / App / Top status bar and bottom menu no longer overlap the “none-safe” screen areas (top and bottom notches)
New / Added iOS Splash screen
Fixed / Email / Weekly Total for Labour Hours missing/incorrect.
Improved / Asset data source storage.
Improved / User offboarding from Workspace tools (internal)
New / Allocation detail report now includes plant quantity
Fixed / App / Single fieldset pages now include correct padding and background
Task / Migrated internal app storage from Sitediary to Gather
Fixed / Allocation Hours / Non Productive Time is no longer NaN when no Shift Duration is set
New / Shift Report PDFs / Image comments now include a link to the related image appendix page
Improved / App / Access Code and Sign-in procedure.
Fixed / Shift Record Status no longer includes Resource Timings to determine if “Awaiting Actuals” or “Draft” Shift
Fixed / Web / Older Line Block Shift Records are now accessible
Fixed / App / Switch workspace is no longer greyed out if there are only 2 workspaces available
New / Resource Timings / Added Start and End Time to individual resources
New / Fatigue Management / Exceedances are driven by Resource Timings, for more detailed analysis.
New / Allocation / Allocated Hours now use Resource Timings for more accurate per-resource allocation of hours
Fixed / Reports / Reports no longer return any information when the date range requested is outside of the Project start/end dates
Fixed / Key Insights menu icon no longer appears when the feature is disabled.
Fixed / Shift Planner now updates correctly when Project configurations are altered
Improved / Workspace Administrators no longer required to be assigned to at least one Project before they can assign themselves to others.
Fixed / App / Worklog time pickers now correctly select the day.
Fixed / Web / When switching Projects, hitting X no longer results in a permissions screen error
Fixed / Web / Planning a Shift with multiple Labour with custom times no longer results in every row having the same value as the first.
Fixed / Emails / Account Manager renamed to Workspace Administrator
New / App and Web / Rebranded App to “Gather”
Improved / Web / Performance of Key Insights
New / List Accordions now contain validation hints to improve visibility of required fields
Fixed / Mobile / Custom company logos no longer collide with the main menu
Improved / Travel to and travel from site times now auto invalidate when pasting in invalid data
Improved / Email Notifications / Reliability improvements with third party provider
Improved / Workspace Reports / From and To dates now correctly set from start and end of the date specified.
Improved / Duplicate project fields now inform you what is de-duplicated
Improved / Language on document uploader.
Improved / Under the hood improvements to search
Fixed / Line Block CSV Reports / Added support for displaying both old and new line block configurations
Improved / Workspace selector post sign in is now searchable
New / Calendar view now supports exporting the current view as iCal
Improved / Shift Record / Visiting a deleted record now produces a message actionable by the user
Improved / Shift Planner / Invalid Labour Names now prevent Shifts from being planned instead of showing a warning, ensuring customers using fatigue benefit from validation of information pasted in from other sources.
Fixed / APP / Single option autocompleted dropdown selection fields are now selectable and do not reset.
Improved / Shift Calendar / Completing a Shift Record now takes you back to your saved view preference in Shift Records.
Improved / Shift Planner / Fatigue Exceedance checks are now a manual action instead of being in real-time, allowing users to concentrate on filling out details before confirming fatigue risks.
Improved / Empty Lists in Shift Records now show more informative information, and can be customised per project configuration.
Fixed / Tweak to User Profile Email Notification preference language
Fixed / App / Allocation no longer force removes decimal points when hours are manually typed in.
Improved / Shift Record Calendar / Switching between Projects when in calendar now consistently keeps the selected view.
Fixed / Web / Full screen filters are now in proportion on mobile devices.
Fixed / Shift Calendar / Shifts set between 11:01pm - 11:59pm without a duration now follow on to the next day by default.
Changed / Web Reports / Shift Reports are now automatically limited to the last 30 days, with a maximum of 365 days of report data available per download.
Improved / Site navigation / Workspace logos now consistently link to the Projects list.
New / Shift Calendar / Introduced new Shift Calendar month and week view of Shift Records.
APP & API Infrastructure upgrades
Fixed / Shift Planner / Some field and office users unable to Plan Shifts
Improved / Sitedocuments report now includes a link to the signed version of documents uploaded
Improved / Workspace switching loading state now more responsive for users with many workspaces
Fixed rounding issues with fatigue exceedance on shift duration / rest durations
Upgraded React Native packages in native application
Improved / Calculated fields now support hidden select fields
Improved / Renamed “Delay Category” universally to “Variance Category”.
Improved / Breadcrumbs are now consistent across all pages within Shift Planner
Improved / Titles are now consistent across all resource pages within Shift Planner
Improved / Copy & Delete buttons now have better hitbox on Shift Planner table rows
Improved / Minor layout adjustments
Fixed / Resource Summary report now always rounds to 2 decimal places
Fixed / Requirements are now correctly enforced in frontend validation for all Project Fields
Fixed / 404 Page no longer throws error boundary, just shows 404 page
Fixed / Internal Tools / Planhat metrics now update number of planned shifts
Improved / Internal Tools / Pimcore Project & Workspace Ref&Name Alterations now update key in object tree
Added / New Inline Permission to allow/deny Project level Key Insights
Fixed / Shift Planner / Shift Assignment emails now fire for all workspaces
Improved / Fatigue Assessment Notifications now include further details, including Actions Taken
Improved / Fatigue Dashboard Reports in Key Insights now include more information about where exceedances or risks occur, to offer better explanation (rolling out to fatigue customers now)
Fixed / Shift Report pagination no longer produces an error when the “Status” filter is applied
Fixed / Weekly Summary emails received on a Friday no longer include statistics for the next week if Shift Records are planned.
Fixed / Creating a new user no longer discards their role
Fixed / User Profile / Default role is now available when adding a new user to a Workspace
Fixed / Sitedocuments / Names now appear when signing documents in some Workspaces in the web
Fixed / Native app / Keyboard no longer covers sign-in password on certain devices
Fixed / Workspace Key Insights / Users with inline access to see Workspace Key Insights no longer able to see menu option when Key Insights isn’t actually enabled.
Fixed / Fatigue Calculator / Many Early morning shifts, followed by an extended resting period and then an early morning shift no longer produce a high Risk Index (false positives)
Fixed / Status filter now persists for Shift Reports
Fixed / Users marked no longer active after User Permissions update now reactivated
Fixed / Project List Pagination now correctly returns access policies for all Projects available
Improved / Various spelling and grammar
New / Updated platform access controls, resources (formally entities) now paired with access policies to provide stateless and zero trust permission system
Improved / Complete overhaul of authentication mechanism, session storage and expiry to most up to date OWASP recommendations
Changed / Account Manager renamed to Workspace Administrator, no longer a “Project Role”
Changed / Project Manager renamed to Project Administrator
Changed / Office Staff renamed to Office User
Changed / Field Staff renamed to Field User
New / Third Party role now available on a per Project basis rather than support request
Fixed / Web / Replacing a Shift Comment Image now immediately updates the replaced image without a page refresh
Fixed / App / Deleting an image from worklog no longer produces a blank box
Fixed / App / Deleting an image in worklog now works for all roles
Fixed / Web / Upload errors now no longer persist in worklog after retrying to upload
Improved / App / Upgraded TouchableOpacity UI components to more performant Pressable components for faster scrollable areas
Fixed / Web / Workspace Admins (Formally Account Managers) can now assign themselves to Projects
Fixed / Reports / Combined Shift Report now supports incomplete entries for Lineblock
New / App / Search for Sitedocuments via a search bar
New / App / Search for Projects via a search bar
Changed / Siteview now available to field users to view their own shifts
New / Web / Projects with free text access points now able to search and sort via access point in Project Shift Record view
Improved / Report / Cached Report API now supports hourly requests rather than once per 24 hours
Improved / 2FA mobile keyboard now numeric
Fixed / Web / Shift Record / Navigating quickly between steps when images are not yet loaded produces TypeError on imageloader toast notifcation
Fixed / Web / Fatigue Summary Day Shift Exceedances occasionally trigger false positives following extended period of night shifts on an individual.
New / Shift Planner / Now supporting Project Configurations without Labour Resources
Fixed / Web users can now refresh Key Insights dashboard via F5 without having to navigate back through other pages
Fixed / Web / Textareas no longer trim whitespace when saves are triggered during typing
Fixed / Native App / Textareas no longer trim whitespace when saves are triggered during typing
Fixed / Reports / Labour Hours report no longer shows 0 for some workspace configurations that use other naming conventions
Improved / Reports order by start date as default as opposed to Network Rail Week number
Improved / Unified Productivity score calculation source to allow more Workspace configurations to see this in Email reports
Fixed / Project Summary report custom date filter dates remain visible when reselecting a predefined date in summary reports.
Fixed / Sharing a Shift Report from the native app to other applications when custom messages are written.
Fixed / Mobile Web / PDF Shift Reports not previewable on Android browsers
Fixed / Shift Planner / Project configurations don’t always update when changes are made
Fixed / Workspace Settings / Some attributes cannot be hidden for customers that no longer need them
Improved / Workspace Settings / Now supports up to 150 characters in activity names
Removed / Shift Planner / Links to legacy CSV Import based Shift Planner
New / Web / Onboarding experience management integrations
New / Native App / Secure share links to Shift Report PDFs directly from the app (to Teams, Slack, Email etc)
Fixed / Dashboard Reporting failures when no data present for report
Fixed / Email Reporting failures when no data present or report non existent for Project configuration
Fixed / Emails / Daily Summary Report Close Calls displays nothing when it should be “0”
Fixed / Emails / Daily Summary Report shows 100% for all KPIS when no Shifts have occurred
Fixed / Workspace Reports / Filter by Tag / Applying a filter then selecting "All data" is not possible
Fixed / Custom duplication configurations for lists i.e Labour, Plant etc
Fixed / Tag modal height rendering on Tablet/Mobile
Fixed / Shift Planner / Shifts created with zero Travel time do not automatically validate when in Shift Record
Improved / Various Layout Tweaks to Project Settings pages
Improved / Complete overhaul of Workspace Settings and Project Settings page internals
Improved / Tweaked Fatigue Management Parameters to bring in line with Network Rail standard
Improved / Dependency management in Activity Settings now autosaves.
New / Added new column to allocation page to show “Allocated Hours”
New / Fluid Layout for all pages
New / Shift Tags
New / Shift Tags / Ability to tag Shifts via Shift Planner
New / Shift Tags / Ability to filter, save and share Project reports via Shift Tags
Major internal and infrastructure upgrades
Fixed / Shift Planner / “Overwrite from” option performs “Add” instead of “Overwrite”
Fixed / Shift Reports / Breadcrumb links are broken on Shift Report preview page
Fixed / Shift Planner + Fatigue Calculations / Calculations sometimes returning larger values when invalid Shift patterns are entered.
Fixed / Native App / Not possible to duplicate worklogs since 2022.1.10
Improvement / Shift Records / Added support for Delay category auto-fill on Line Block Access Type
Improvement / Native app / Upgraded React Native to 0.70
New / Shift Reports / MVP Gantt chart support for PDF Combined Shift Report
Fixed / Shift Planner / Empty select dropdowns do not save during specific project configuration updates between shift planner sessions
Fixed / Shift Planner / Columns slightly out of line with headers
Fixed / Shift Planner / Training data included in some fatigue analysis
Fixed / Force upgrade some iOS clients to latest app to receive line block / unique labour resource updates
Improvement / Shift Planner now falls back gracefully on Projects where fatigue analysis isn’t available, but is enabled in the Workspace
Improvement / Shift Planner / Added title attribute to explain each icon and empty state
Improvement / Shift Planner / Added shift duration to list screen title, perhaps as smaller text
Improvement / Shift Planner / Re-enabled copy on labour resources
Improvement / Ensure fatigue icons are cleared when removing removing all labour from a final shift with labour on
Fixed / App / When adding only images in comments, sometimes the comment is removed
Fixed / Mobile Web / Shift Report PDFs won’t render in Safari (iOS 16)
New / Platform / Added setVisible/setDisabled support for calculated fields
New / Shift Planner / Added Support for Line block Access Type
New / Platform / Added Works commence and works complete to Line Block Aaccess Type
New / Shift Planner / Fatigue Analysis for Individual Labour Resources
New / Shift Planner / Exceedance Analysis for Individual Labour Resources
Improvement / Shift Planner / Free Text fields supported in first page