Resource Only Configuration Overview

Using the Resource-Only Configuration

This article guides you through Gather's Resource-Only configuration.

Shift Record Steps

The Resource-Only configuration features a three-step process for creating Shift Records:

Step 1: Shift Information

This step requires you to input the following:

  • Start Time: Time the shift begins.

  • End Time: Time the shift ends.

  • Shift Duration: Recorded duration of the shift in hours.

  • Contract Reference: Editable field configured in Project Settings.

  • Meeting Point: Editable field configured in Project Settings.

  • Assignee: Who is assigned to fill out to the Shift Record.

To edit the dropdown options for the Contract Reference or the Meeting Point, please refer to the following article:

Project Datasources

Customising Dropdowns in Gather Projects

Step 2: Resource Information

This step requires you to input the following:

  • Supplier: Name of the Supplier for the particular Role.

  • Role Type: The Role Type/ job title.

  • Name: People Profile name.

  • Profile ID: Unique Identifier associated with the People Profile.

  • Travel Time (To Site): Time taken to arrive at site.

  • Travel Time (From Site): Time taken to return home from site.

  • Resource Start Time: The time the specific Resource began working.

  • Resource End Time: The time the specific Resource finished working.

Step 3: Shift Comments

This step requires you to input the following:

  • Shift Comments: Capture general comments about the shift (one picture allowed per comment).

  • Health & Safety Issues: Document any accidents, Incidents, or Health & Safety Issues that occurred during the shift- along with a related photo.

  • Environmental Issues: Capture any Environmental Issues encountered during the shift- along with a related photo.

Reports in the Resource-Only Configuration

Shift Reports:

  • Health & Safety Issues Raised

  • Resource Count

  • Resource Information

  • Shift Comments

  • Health & Safety Issues

  • Environmental Issues

  • Appendix A - Images

  • Appendix B - Signed Documents

Summary Reports:

These reports are divided into three sections:

  • General: Shift Narrative Report, Compliance Summary Report, Compliance Detail Report,
    Image Report, Site Documents Report,
    Fatigue Risk Assessment Report, Health & Safety Issues Report

  • Resource: People Detail Report

General Reports

Gain insights from shift narratives, track performance metrics, and ensure all project information is captured.

Resource Reports

Gain insights into labour, plant, material usage, and streamline processes for better project delivery and cost control.

Series 

Overview of Fatigue Management

Resource Only Configuration Overview ⬅️ You are here 

Using Shift Planner for Fatigue Management

Fatigue Risk index Explained

Fatigue Management FAQs

Did this answer your question?
😞
😐
😁